Documents/Feasibility Study
This covers the documents that have arisen from the Maui Department of Water Supply (MDWS) so called Feasibility Study for East Maui water source development. This is partly to satisfy the requirements of the 2003 Consent Decree.
2021 05 21 East Maui FS Proposal – REVISED
Proposal from Brown and Caldwell for performing the Feasibility Study. This is a letter from B&C to MDWS. This letter primarily concerns Phases 1 and 2.
Date: 2021
Size: 500 KB
Source: Brown & Caldwell
2023 05 08 East Maui FS Phase 3 and 4 Proposal
Proposal from Brown and Caldwell for performing the Feasibility Study. This is a letter from B&C to MDWS. This letter primarily concerns Phases 3 and 4.
Date: 2023
Size: 1.7 MB
Source: Brown and Caldwell
East Maui Water RFS Scope of Work Comments
Comments from the Sierra Club on the original RFP for a East Maui Feasibility Study
Date: 2021
Size: 50 KB
Source: Sierra Club
Download (Word Doc – not viewable on-line)
Part 1 – 2023-07-13-Demand-and-Capacity-Phase-1
Phase 1 of the Feasibility Study
Date: 2023
Size: 4 MB
Source: Brown & Caldwell
Part 2 – 2023-07-10-East-Maui-Phase-2
Phase 2 of the Feasibility Study
Date: 2023
Size: 6.6 MB
Source: Brown & Caldwell
Part 3 – Feasibility study-Cost Benefit
Phase 3 Cost-Benefit analysis of the feasibility study by Brown and Caldwell
Date: 2025
Size: 6.8 MB
Source: Brown & Caldwell
Part 3- Feasibility study- Ka Paakai analyses
Phase 3 Ka Pa’akai analysis of the feasibility study by Brown and Caldwell
Date: 2025
Size: 2.8 MB
Source: Brown and Caldwell
Part 4- Feasibility study – Haiku stream restoration
Phase 4 of the East Maui Feasibility Study
Date: 2024
Size: 5.7 MB
Source: Brown & Caldwell