Skip to content Skip to footer

Documents/Feasibility Study

This covers the documents that have arisen from the Maui Department of Water Supply (MDWS) so called Feasibility Study for East Maui water source development. This is partly to satisfy the requirements of the 2003 Consent Decree.


2021 05 21 East Maui FS Proposal – REVISED

Proposal from Brown and Caldwell for performing the Feasibility Study. This is a letter from B&C to MDWS. This letter primarily concerns Phases 1 and 2.

Date: 2021
Size: 500 KB
Source: Brown & Caldwell

Download/View


2023 05 08 East Maui FS Phase 3 and 4 Proposal

Proposal from Brown and Caldwell for performing the Feasibility Study. This is a letter from B&C to MDWS. This letter primarily concerns Phases 3 and 4.

Date: 2023
Size: 1.7 MB
Source: Brown and Caldwell

Download/View


East Maui Water RFS Scope of Work Comments

Comments from the Sierra Club on the original RFP for a East Maui Feasibility Study

Date: 2021
Size: 50 KB
Source: Sierra Club

Download (Word Doc – not viewable on-line)


Part 1 – 2023-07-13-Demand-and-Capacity-Phase-1

Phase 1 of the Feasibility Study

Date: 2023
Size: 4 MB
Source: Brown & Caldwell

Download/View


Part 2 – 2023-07-10-East-Maui-Phase-2

Phase 2 of the Feasibility Study

Date: 2023
Size: 6.6 MB
Source: Brown & Caldwell

Download/View


Part 3 – Feasibility study-Cost Benefit

Phase 3 Cost-Benefit analysis of the feasibility study by Brown and Caldwell

Date: 2025
Size: 6.8 MB
Source: Brown & Caldwell

Download/View


Part 3- Feasibility study- Ka Paakai analyses

Phase 3 Ka Pa’akai analysis of the feasibility study by Brown and Caldwell

Date: 2025
Size: 2.8 MB
Source: Brown and Caldwell

Download/View


Part 4- Feasibility study – Haiku stream restoration

Phase 4 of the East Maui Feasibility Study

Date: 2024
Size: 5.7 MB
Source: Brown & Caldwell

Download/View